Immaculate Heart of Mary Catholic Church

By Sophie Vagle | June 19, 2023 | Comments Off on Immaculate Heart of Mary Catholic Church

Immaculate Heart of Mary Catholic Church embarked on an ambitious mission to construct a multi-building church campus, encompassing a total of 12,000 square feet across five distinct facilities. After a rigorous selection process, the church entrusted the turnkey solution to VESTA, a company recognized for its comprehensive project management and manufacturing capabilities. The blueprint for…

Police Range Training Center

By Sophie Vagle | June 19, 2023 | Comments Off on Police Range Training Center

The Police Range Training Center, located in Hammond, Indiana, had surpassed the capacity of its previous infrastructure. Initial proposals for a traditionally constructed edifice were abruptly discontinued due to the unexpectedly high cost. Consequently, the organization began to explore the option of a permanent modular office building. VESTA was able to offer detailed specifications and…

Asbury United Methodist Church

By Sophie Vagle | May 31, 2023 | Comments Off on Asbury United Methodist Church

Asbury United Methodist Church in Livermore, CA. needed a new modular office building to replace their current dilapidated and hazardous modular building. Asbury United Methodist Church chose VESTA Modular for our ability to adhere to stringent time constraints and provide a cost-effective solution. VESTA was able to quickly begin the design process and get a…

Beyond the Box | Inserv Solutions

By Sophie Vagle | May 19, 2023 | Comments Off on Beyond the Box | Inserv Solutions

Inserv Solutions was subcontracted by Eli Lilly Pharmaceuticals at the site of their new pharmaceutical manufacturing plant in Concord, NC. Inserv needed enough office space to accommodate their engineers, project managers, site superintendents, and workforce. They also needed a one stop shop for all ancillary products. VESTA provided the solution of a 48×60 V-plex office…

PHI Aviation

By Sophie Vagle | May 12, 2023 | Comments Off on PHI Aviation

Backed by a fleet of more than 200 helicopters and one of the most experienced teams in the industry, PHI Aviation helicopter operations stretch from North America to the offshore waters of Latin America, Africa, Australia, New Zealand, Southeast Asia and the Middle East. Their Houma, LA location was experiencing rapid growth, which required them…

Birch Grove Montessori and University Prep

By Sophie Vagle | May 11, 2023 | Comments Off on Birch Grove Montessori and University Prep

Birch Grove Montessori and University Prep School in Southeast Michigan had 42-acres of rural space and needed a facility to accommodate their needs. It was imperative for the school to be designed and installed for future expansions. VESTA worked with the school board to provide a 10-classroom modular building. During the design phase, VESTA utilized…

Peaceful Valley Donkey Rescue

By Sophie Vagle | May 3, 2023 | Comments Off on Peaceful Valley Donkey Rescue

The world’s leading donkey rescue organization, Peaceful Valley Donkey Rescue, was seeing increasing growth at their San Angelo, TX location. The owners of Peaceful Valley were in the market for a cost-effective and time-sensitive modular solution to help alleviate and sustain their growing size. VESTA, as a local dealer, was approached and awarded the contract…

Beyond the Box | Detroit Leadership Academy

By Kristin Marino | April 27, 2023 | Comments Off on Beyond the Box | Detroit Leadership Academy

VESTA’s Beyond the Box program offers add on services that can be customized to fit your needs. Due to enrollment growth, The Detroit Leadership Academy needed an additional modular classroom building and with it they had VESTA provide a turnkey solution that included furniture as well as ADA compliant aluminum deck, steps, and ramps. The…

Yale University

By Sophie Vagle | April 25, 2023 | Comments Off on Yale University

The athletic department at Yale University in West Haven, CT was ready to begin the repair and renovation of their existing facilities utilized by the football and track programs. During the renovation, the department wanted to keep their athletic programs on campus, and needed space to continue operations which led them to acquire temporary facilities.…

Montessori Radmoor School

By Sophie Vagle | March 30, 2023 | Comments Off on Montessori Radmoor School

During the COVID-19 pandemic, Montessori Radmoor School was looking for additional classrooms along with site upgrades. Because of the lack of on-site construction resources and manpower during this time, VESTA was chosen to work alongside Stevens Architects for a turnkey solution for the campus. VESTA designed a new, custom modular building with three classrooms, restrooms,…

Jalen Rose Leadership Academy

By Kristin Marino | March 29, 2023 | Comments Off on Jalen Rose Leadership Academy

In 2011, JRLA held their first day of classes. After the school year though, they were ready to expand to meet the needs of their growing student population. In 2012, JRLA purchased an existing school building in Detroit. Their goal was to grow this school by six classrooms and provide the teachers with a break…

Vandebilt Catholic High School

By Sophie Vagle | March 29, 2023 | Comments Off on Vandebilt Catholic High School

Hurricane Ida devastated Vandebilt Catholic High School including their locker room. To continue facilitating their sports programs, their campus needed a temporary locker room. Due to the strict timeline, VESTA’s modular solutions were recommended to VCHS by a local architect. VESTA was contacted by the school to develop and provide a floor plan that would…

Culver Duck

By Sophie Vagle | March 20, 2023 | Comments Off on Culver Duck

Culver Duck, a duck processing company, in Middlebury, Indiana has expanded their business to the point of needing a new, larger building. The goal of the new building was to provide an open workspace to improve productivity and a welcoming space for public to enjoy learning techniques to cook duck properly. The needs of Culver…

City of Lewisville Fire Department

By Sophie Vagle | March 14, 2023 | Comments Off on City of Lewisville Fire Department

The City of Lewisville needs their Fire Department operational 24/7, so when the urgency for a new crew quarter building arose, they searched out a solution that would keep them continuously functional. Their current building had become out of code compliance and systems were not fully functional. Due to the necessity of a fully staffed…

Miller Family Healthcare

By Sophie Vagle | March 9, 2023 | Comments Off on Miller Family Healthcare

In the small town of Moorefield, WV, Miller Family Healthcare was ready to own their own healthcare building. The practice was operating in an outdated office space that was no longer suitable for their growth. From the early on-set of the project, VESTA made many site visits and sat down with the Miller Family Healthcare…

Tonto Apache Tribe

By Sophie Vagle | March 1, 2023 | Comments Off on Tonto Apache Tribe

A new medical clinic building was needed for The Tonto Apache Tribe in Payson, AZ. Their needs and requirements consisted of a floorplan which included 4 exam rooms, a patient waiting area, a staff work area, an office, as well as a reception area. VESTA was contracted to supply and install the building, ramps and…

The Holderness School

By Sophie Vagle | February 17, 2023 | Comments Off on The Holderness School

The Holderness School reached out to VESTA to assist with a new modular dormitory that would house 12 students & 1 faculty staff as they had a campus density issue and needed additional space for the students. The school wanted a building to blend in with the wooded environment and have minimal impact to the…

Training Facility

By Sophie Vagle | February 10, 2023 | Comments Off on Training Facility

A leading manufacturer of aircraft systems for US and allied military forces around the world, recently launched a new project. They had an immediate need for a fast track, mission critical, world-class training facility for use in training a new client. VESTA partnered with Ramtech Building Systems to meet both the budget and the customer’s schedule requirements.…

Rusk State Hospital

By Sophie Vagle | February 2, 2023 | Comments Off on Rusk State Hospital

The Health and Human Services Commission of Texas at Rusk State Hospital started the process of drawing up plans to remodel their onsite buildings. During the planning process, the HHSC recognized the need to replace their pharmacy and needed a temporary space for their personnel during the 36-month process. The project was put out to…

PVS Chemical Solutions

By Sophie Vagle | January 19, 2023 | Comments Off on PVS Chemical Solutions

PVS Chemical Solutions was in need for a new Men’s Shower/Locker/Break Room facility as part of a plan to upgrade facilities at its Chicago manufacturing operation. A very high level of priority was placed on providing a better working environment for the production team. New showers, restrooms and a locker area were provided to replace…

Martha’s Vineyard

By Sophie Vagle | December 21, 2022 | Comments Off on Martha’s Vineyard

The Town of Tisbury, on the island of Martha’s Vineyard, had an elementary school that needed renovation to the building, which was plagued with lead, asbestos, and building envelope problems. The convenience of modular and the lack of access to the surrounding buildings led the town to release this project out to bid. The proposed…

Birdville Independent School District

By Kristin Marino | December 9, 2022 | Comments Off on Birdville Independent School District

The board of Birdville ISD identified the need to consolidate existing modular units of one of their elementary campuses into a single building. The elementary school previously had four 24’x64’ double classroom buildings with standard interior and exterior finishes. The school board’s mission was to consolidate the four individual buildings into one permanent 8 classroom…

MANCHESTER BOE

By Kristin Marino | October 28, 2022 | Comments Off on MANCHESTER BOE
Picking a Modular Building Floor Plan Perfect for Your Needs

Manchester BOE needed additional office space since they ran out of offices in their administration office. They required a building that had 6 private offices. VESTA was able to provide a used building that had the space to accommodate what they needed. VESTA installed the office building in short time and great customer service. We…

FREEDOM CHURCH

By Kristin Marino | October 20, 2022 | Comments Off on FREEDOM CHURCH
FREEDOM CHURCH Group photo

Freedom Church does a yearly, special televised local event and was looking for a temporary solution to utilize for the month of October. They needed a temporary staging area for their performers, including costume storage, changing room and makeup area. They required space close to their existing building with easy access to the sanctuary’s side…

Cirque Du Soleil

By Kristin Marino | October 18, 2022 | Comments Off on Cirque Du Soleil

Cirque Du Soleil America Newco Inc needed temporary offices for their upcoming show in Atlanta. The offices would accommodate accounting, security, technical personnel, and their staff during the 3 month show. They had limited space available for offices and storage, in an open parking lot where they were setting up “The Big Top”, and would…

Detroit Leadership Academy

By Kristin Marino | October 13, 2022 | Comments Off on Detroit Leadership Academy

Detroit Leadership Academy is a pre-k through 12 program that has grown tremendously over the years, resulting in the need for additional classroom space, which VESTA provided in three phases. In the first and second phases, our team added a 4 and 6 classroom building with restrooms, respectively, to serve the elementary and preschool students.…

E-CENTER HEAD START

By Kristin Marino | October 7, 2022 | Comments Off on E-CENTER HEAD START

Due to over-crowding and an increase in enrollment, E-Center, a Head Start backed daycare in Northern California, needed a solution to accommodate their growth. With time constraints and a need for minimal site disruption, they turned to modular construction for a cost and time effective, streamlined solution. VESTA provided a 36×48 modular daycare building including…

CALCASIEU PARISH SCHOOLS

By Kristin Marino | September 8, 2022 | Comments Off on CALCASIEU PARISH SCHOOLS

Hurricane IDA caused significant damage to the Calcasieu Parish Schools creating a challenge for students to return to class. VESTA was able to step up in helping provide over 100,000 square feet of temporary modular classroom and office space throughout the district. With a critical need, VESTA was able to quickly secure manufacturing line time…

TERREBONNE SCHOOL DISTRICT

By Kristin Marino | September 6, 2022 | Comments Off on TERREBONNE SCHOOL DISTRICT

Terrebonne Parish School District had two school campuses completely destroyed during Hurricane Ida. They needed temporary space quickly to get the students back in class and relieve overcrowding at other buildings within the district. VESTA was awarded the job of designing and building two entire high school campuses for South Terrebonne High School and Ellender…

FABCON PRECAST

By Kristin Marino | August 29, 2022 | Comments Off on FABCON PRECAST

Fabcon bought an old pre-cast concrete plant that was in need of immediate repairs. In order to expedite the opening of the factory floor to take orders, they needed a locker room building. We provided them with a 24’x 60’ locker and rest-room that had 75 double tier lockers for their employees. Because of the…

Kreate Events Storage

By nc | August 24, 2022 | Comments Off on Kreate Events Storage

VESTA provided Kreate Events with (4)8’x40’ and (2) 8’x20’ for equipment storage while preparing for the big game. Kreate Events needed storage space to hold all equipment for the venues surrounding Hard Rock Stadium while they set up all the spaces. VESTA leased the containers for 1 month for set-up and teardown of the game.

Decco Restrooms

By nc | August 24, 2022 | Comments Off on Decco Restrooms

VESTA was hired to design, manufacture and deliver (2) 12’x32’ restroom trailers to Port Everglades to be shipped to a beach club in the Cayman Islands. The customer handled shipping freight and install at the beach club. The men’s restroom building comes with 6 toilets, 6 urinals and 5 sinks. The women’s restrooms has 8…

Traphagen Elementary School

By nc | August 24, 2022 | Comments Off on Traphagen Elementary School
Traphagen

Mount Vernon City School District was renovating Traphagen Elementary School and was not going to be completed in time for the start of the school year. We worked with the client to utilize an existing 2-classroom building to meet their needs. They did not need restrooms so we converted the existing restrooms into storage closets.…

South Windsor Public Schools

By nc | August 24, 2022 | Comments Off on South Windsor Public Schools

South Windsor Public Schools needed a modular supplier to provide classroom space due to increased enrollment. VESTA was able to utilize a cooperative purchasing agreement to supply South Windsor with the classroom space they needed and within a quick time frame. We provided them with an existing 4 classroom building that would fit their requirements…

LaGrange Lock and Dam

By nc | August 24, 2022 | Comments Off on LaGrange Lock and Dam

LaGrange Lock and Dam is a complex on the Illinois River at Versailles, Illinois. The U.S. Army Corps of Engineers built the complex from 1936 to 1939. LaGrange Lock and Dam needed a Control Shed that would be placed inside the dam area to control the dam and locks. When river waters rise, the control…

Central Bucks School District

By nc | August 24, 2022 | Comments Off on Central Bucks School District

Central Bucks School District needed additional 4 classrooms for at least 6 years due to increased enrollment. VESTA was able to step in and provide a turn-key classroom solution with carpet tiles, fire suppression and a connecting ADA corridor to the existing school. We were able to utilize a cooperative purchasing agreement which avoided a…

Cleveland County Emergency Medical Services

By nc | August 23, 2022 | Comments Off on Cleveland County Emergency Medical Services

Cleveland County Emergency Medical Services (EMS) provides life-saving services to citizens during medical emergencies. They needed a quick housing solution for the responders while on the job. VESTA provided them with a living space that has 2 bedrooms, 3 full bathrooms, kitchen and living room as well as laundry space. We finished the exterior with…

MLP PA Builders

By nc | August 4, 2022 | Comments Off on MLP PA Builders

MLP PA Builders On-Site Office MLP PA Builders needed an on-site office during construction of new Discovery labs for the University of Pennsylvania Gene Therapy Program. This program focuses on expanding research operations for the development of genetic medicines. VESTA was able to provide a double wide building with 4 private offices and restroom so…

Winkelman School

By nc | June 22, 2022 | Comments Off on Winkelman School

VESTA was contacted by West Northfield SD 31 in February 2018 to provide a proposal for a permanent space solution. Previously, they were accommodating expanding programs that required additional space to maintain small classroom sizes and wanted to add a FT Kindergarten, teacher workrooms, meeting space, and pre-school services provided by the regional Special Ed…

Level One Trauma Center

By nc | June 22, 2022 | Comments Off on Level One Trauma Center

Winthrop-University Hospital was looking to add a Level One Trauma Center to the emergency department that would be able to treat both children and adult trauma patients. The addition needed to be located adjacent to the existing emergency department, but not impact the operations of the emergency department for an extended period of time. The…

Alternative Education Building

By nc | June 22, 2022 | Comments Off on Alternative Education Building

The Alternative Education Program at Spring Lake High School in Spring Lake, MI, had been housed in 25-year-old modular buildings located in the bus garage parking lot. The district wanted an upgraded facility that would provide the students with an educational environment that was equal to that of the recently updated high school. The building…

St. Cloud VA Medical Center

By nc | June 22, 2022 | Comments Off on St. Cloud VA Medical Center

St. Cloud VA Medical Center provides health care services to Veterans in central, west central and northern Minnesota. They were looking to expand their Primary Care Service line and needed additional building space.  They required a turnkey solution and had a stringent 120-day construction timeline. With specific needs that included; 16 additional Exam Rooms, a Nurse’s Station, Reception…

Modular Student Dorm

By nc | June 22, 2022 | Comments Off on Modular Student Dorm

Sequel was in need of a facility to accommodate the tremendous growth the Sioux Falls location has been experiencing. Before turning to VESTA, Sequel was having a hard time finding the right solution that was not only feasible but could be built in the quick time frame they needed. VESTA was able to secure an…

South Walton Temporary Classrooms

By nc | June 22, 2022 | Comments Off on South Walton Temporary Classrooms

Due to growing enrollment, the South Walton Academy was facing issues with space for their students. They had contracted to add an addition to the school through on-site construction. This addition was due to be completed before the school year started but the contractor pushed the completion date to January 2022. As a private school,…

Spelman College | Art Studio

By nc | June 22, 2022 | Comments Off on Spelman College | Art Studio

Spelman College needed a quick solution that would provide their students with additional art space before they returned from winter break. The open classroom space is used for a multi-use 3d art studio where they have special rooms for woodworking, print making, and pottery. The facility was outfitted with special floor and fireproof materials so…

Temporary Pharmacy

By nc | June 22, 2022 | Comments Off on Temporary Pharmacy

Major Pharmaceutical Retailer had an urgent need for building space at multiple retail locations in Chicago and Minneapolis; they required temporary pharmacies to continue serving customers during renovation and rebuilding of their existing stores. As the General Contractor, Sevan Multi-Site Solutions contacted us to determine if modular buildings could be provided to meet their client’s…

Subaru of Indiana Automotive

By nc | June 22, 2022 | Comments Off on Subaru of Indiana Automotive

The 4.7 million SF Subaru of Indiana Automotive receives more than 800 semi-trucks carrying production parts each day. In order to minimize the cost of inventory and the space required under roof to store SIA operates with a “Just in Time” parts delivery system. As production rates ramped up transport carriers arriving on site were…

Mobile Teaching Lab

By nc | June 22, 2022 | Comments Off on Mobile Teaching Lab

VESTA Modular was awarded a contract with the Tennessee Board of Regents (TBR) to design, engineer, solicit manufacturing proposals, and production and site installation of a steel framed modular structure to be used as a mobile training center located at one of Tennessee’s State Universities. In the design phase VESTA worked with TBR to move…

The Citadel Dormitory

By nc | June 22, 2022 | Comments Off on The Citadel Dormitory

Charleston, SC is known for Rainbow Row and Magnolia Plantation. The campus of The Citadel is also known for its Romanesque style of architecture, and the staff at The Citadel wanted to maintain the look and feel of the iconic architecture on their campus. The goal of the project was to create a dormitory that…

The Hill School

By nc | June 22, 2022 | Comments Off on The Hill School

The Hill School, a private boarding high school, had an immediate need for additional dormitory space to support a growing student population and plans to renovate existing dorms in the future. VESTA Modular came up with a unique floorplan that housed 28 students, 1 staff room and 1 family staff room with a lounge space,…

University Looking for COVID-19 Isolation Space

By nc | June 22, 2022 | Comments Off on University Looking for COVID-19 Isolation Space

In an effort to safely return students to campus during the COVID19 pandemic, the University of Richmond sought out VESTA modular to pro-vide a quick and efficient building solution to meet the student’s health and academic needs. The challenge presented to VESTA was to build, deliver, and install 150 beds before the students returned to…

Temporary Isolation Dormitories

By nc | June 22, 2022 | Comments Off on Temporary Isolation Dormitories

Tufts University has created special dorms for students who test positive for the corona-virus as part of the steps the school is taking to welcome students back in the fall. The modular dormitories will be used as living spaces for students that need to be quarantined. The spaces will allow students to have clean, quiet…

Tri-Valley Opportunity Council Head Start

By nc | June 22, 2022 | Comments Off on Tri-Valley Opportunity Council Head Start

Until 2011, the Tri-Valley Opportunity Council’s Head Start Child & Family Programs for the Sleepy Eye area were housed in the Sleepy Eye Elementary School. Eventually, the school district needed the leased space for their own programs, leaving Tri-Valley looking for a new facility. The district offered to work with Tri-Valley on the new facility…

Temporary Medical Facility

By nc | June 22, 2022 | Comments Off on Temporary Medical Facility

A large urban hospital system was in the process of implementing an aggressive 10-year master building and renovation plan. To be successful, an interim facility was needed to ensure all medical and administrative programs remained in continuous operation. The facility would house all levels of medical and administrative staff displaced during demolition and reconstruction. A…

Thea Bowman Leadership Academy

By nc | June 22, 2022 | Comments Off on Thea Bowman Leadership Academy

Leaders of the Thea Bowman Leadership Academy identified the need to extend their elementary and middle school program to include a high school. The achievements of the K–8 program and the waiting list for the 9–12 grades would ensure a full enrollment if the facility could be provided. The new facility would house both the…

Veritas Rapid Oncology Center

By nc | June 22, 2022 | Comments Off on Veritas Rapid Oncology Center

Veritas Medical Solutions contacted our team to provide modular buildings to supplement their Linear Accelerator used to treat small animals at ISU, a major Midwestern Research University. Veritas had a design-build contract to add the vault, constructed using their innovative approach to house the LINAC equipment and needed a partner to provide the support buildings.…

Permanent Modular Scale House

By nc | June 22, 2022 | Comments Off on Permanent Modular Scale House

Waste Management in Logansport, IN was in need of a new scale house. They had been renting a mobile office that was too small for their needs and wanted to expand their space. Due to a new scale built at that location, they wanted to purchase the facility to be built on a permanent foundation.…

Wellspan Health and Surgery

By nc | June 22, 2022 | Comments Off on Wellspan Health and Surgery

Wellspan Health & Surgery Center required the addition of an MRI unit to their existing facility. Originally, Wellspan was looking to add a mobile imaging trailer to fulfill their need. Due to limited space and cost, VESTA was contacted to provide a solution for a permanent building to house a Philips Ingenia Elition 3.0T X…

University of Texas – San Antonio Student Success Center

By nc | June 22, 2022 | Comments Off on University of Texas – San Antonio Student Success Center

UTSA needed a building solution that allowed them to consolidate all of their student advisors under one roof. This would provide an efficient place for students to connect with their advisors and for the advisors to collaborate together. VESTA was involved in the project from its inception. We coordinated with the architect and university officials…

Vision Metals

By nc | June 22, 2022 | Comments Off on Vision Metals

Vision Metals reached out to VESTA to provide them with a new office building to replace an existing outdated building. Modular was the clear building solution to meet their schedule and requirements. VESTA was able to provide a new double-wide office building in a timely manner that fit within the customer’s time and budget. The…

Nature Walk Montessori School | Pre-K

By nc | June 22, 2022 | Comments Off on Nature Walk Montessori School | Pre-K

Nature Walk is a private charter school, fully self-funded by the owners, and as such, they require a partner that understands their passion, needs and can-do spirit to assist in completing their dream. This project required creative thinking and true entrepreneur work ethic to accomplish within their budget and timeframe. We were able to repurpose…

Temporary Classrooms

By nc | June 22, 2022 | Comments Off on Temporary Classrooms

After the flooding of the Souris River in Minot, North Dakota in June of 2011, the school district was concerned about how and where to begin the upcoming school year. The devastating flood that struck much of North Dakota displaced roughly 776 students when the Souris River spilled over protective levies and flooded schools, businesses…

Naval Station Mayport

By nc | June 22, 2022 | Comments Off on Naval Station Mayport

We were approached by the Naval Station in Mayport, Florida to build out a 3 phase design-build construction project. The purpose of the project was to increase office space to accommodate an influx of necessary staff to support their littoral combat ships. The Southeast Regional Maintenance Center (SERMC) requested the use of modular office buildings…

Nature Walk Montessori School | Daycare

By nc | June 22, 2022 | Comments Off on Nature Walk Montessori School | Daycare

Nature Walk Montessori School in Round Lake, IL was looking to open their doors for the upcoming school year. It was important to the owner that the structure would fit into the surrounding nature of the property as well as stay within their budget. Also, to protect their investment, the school needed to be sure…

Washington Early Learning Center

By nc | June 22, 2022 | Comments Off on Washington Early Learning Center

Beginning in 1950, the Washington Early Learning Center in Mundelein School District 75 built out their kindergarten through second grade program in four phases, but the space had once again met capacity. With an anticipated increase as the result of a new subdivision being built nearby, along with knowing that the upcoming group of kindergartners…

Nottawaseppi Huron | Head Start

By nc | June 22, 2022 | Comments Off on Nottawaseppi Huron | Head Start

The Nottawaseppi Huron Band of the Potawatomi Indian Tribe (NHBP), was searching for adequate space that would allow for full functionality of their day care program by the start of school. The tribe needed their new facility to blend into the rural wooded area out of respect for the land. Without a timely solution, they…

New Trier High School

By nc | June 22, 2022 | Comments Off on New Trier High School

When New Trier High School’s renovation project was approved in a November referendum, they knew they needed to develop a plan to house their students during the two year phased construction project. Shortly after that school year ended, the old 1931 Tech Arts Building was torn down on the campus, but this required displacement of…

Neurology & Stroke Associates

By nc | June 22, 2022 | Comments Off on Neurology & Stroke Associates

With the absence of a local MRI, patients of the Neurology and Stroke Associates in Lititz, Pennsylvania were forced to travel to surrounding cities for scans. For the independently owned and operated practice to improve their patient’s experience they sought to add their own system, but zoning and limited space for new construction would make…

Permanent Modular Classrooms

By nc | June 22, 2022 | Comments Off on Permanent Modular Classrooms

Notre Dame Preparatory School bought property with the hopes to move all their campuses to one location, after renovating the buildings on the property, they were still in need of additional classroom space. To create the necessary space, our team built a single story, 13 module addition that was connected to the exiting building with…

Apartments on Man-Made Island

By nc | June 22, 2022 | Comments Off on Apartments on Man-Made Island

MSC Cruse line set out to build a man-made island in the middle of the Atlantic Ocean to serve as a day stop destination for the cruise ship passengers. By utilizing two different manufacturing partners, one located in Florida and the other in Georgia, to construct 80 modules off site in less than 90 days,…

PCDG Construction Office

By nc | June 22, 2022 | Comments Off on PCDG Construction Office

PCDG Construction was looking for a modular building provider that could build the custom sales center they needed during the development of the high end condo, retail, and auto museum project they were building in Orlando, FL. VESTA Modular was able to provide PCDG what others couldn’t do, a custom building and a financing solution…

Imaging Building

By nc | June 22, 2022 | Comments Off on Imaging Building

Our team was contacted by Park Nicollet Health Services to provide a proposal for a new imaging building. Their goal was to upgrade their equipment and create a space where both their CT scanner and MRI equipment could be located. Through a standing relationship with an OEM provider, expedited engineering and support was delivered during…

Middle School Classrooms

By nc | June 22, 2022 | Comments Off on Middle School Classrooms

Old Redford Academy purchased an existing church adjacent to their elementary for their expanding middle school population. They renovated the existing church building to accommodate an auditorium, cafeteria, gym and office space. After the renovation they were still in need of additional middle school classroom space. Our Team constructed a 2-story modular addition that connected…

Old Redford Elementary School

By nc | June 22, 2022 | Comments Off on Old Redford Elementary School

The current school was housed in an older building which was no longer appropriate as an education facility. The school board recognized the need for a new building, however they had a very short time frame. They required a creative cost effective solution without sacrificing quality. The school board looked to VESTA Modular to design…

Luxury Resort Villas in Virgin Gorda

By nc | June 22, 2022 | Comments Off on Luxury Resort Villas in Virgin Gorda

Oil Nut Bay (ONB) Resort is one of the most prestigious resorts in the world. Positioned at the eastern most tip of Virgin Gorda, this location provides the sense of living and vacationing on a private island; an atmosphere of exclusivity and luxury that feels like it should only be accessible by yacht or private…

VA Medical Center

By nc | June 22, 2022 | Comments Off on VA Medical Center

VESTA provided a 2,160 square foot facility for use by the Saginaw VA personnel. The building includes 10 offices, open cubicle area, copy room, break room, and restroom facilities. VESTA provided the project on this challenging site, on time and on budget.

Permanent Locker Room

By nc | June 22, 2022 | Comments Off on Permanent Locker Room

A VESTA client, with a stellar safety record and documented safety protocol was looking to provide their plant staff a more modern shower/locker room environment and break area. Additionally, they had a need for a small amount of office space and a secure file room. This client had a very tight time line and stringent…

Christian School Expansion

By nc | June 22, 2022 | Comments Off on Christian School Expansion

Reborn Christian Academy came to VESTA Modular with an initial need for ten 24’ x 36’ modular classrooms. After doing a site visit with Pastor Edwin Ramirez, our teams agreed that for security and cost considerations, we would be able to utilize three of our fleet buildings a 6,720 sq. ft. 8 – classroom building,…

Ritz Carlton

By nc | June 22, 2022 | Comments Off on Ritz Carlton

PCL Construction was renovating and adding an addition to the Ritz Carlton hotel in Naples, FL. PCL was looking for a modular building provider that could build offices for their on-site contactors VESTA Modular was able to provide PCL Construction with an efficient turnaround time with new modulars for the five plex. Our team worked…

Saint Xavier University

By nc | June 22, 2022 | Comments Off on Saint Xavier University

VESTA was contacted by Saint Xavier University in Chicago, IL to create a permanent building for their 3-D Art Studio. Taking the history of the campus into account, we installed an exterior facade to complement the existing university building including split face CMU base, smooth brick finish, fiber cement board panels and metal coping. This…

Hamilton College Student Dormitories

By nc | June 22, 2022 | Comments Off on Hamilton College Student Dormitories

Hamilton College needed “temporary” dorm space to space out the students during the coronavirus outbreak. They bought these buildings with the intent to relocate them or sell them in the future. They needed dormitory space for approximately 72 students and needed to have a commune space with kitchenette and laundry facilities. We utilized a design…

Herbert Hoover High School

By nc | June 22, 2022 | Comments Off on Herbert Hoover High School

In June of 2016, a disastrous flood hit the county of Kanawha; Elkview, West Virginia and surrounding areas. The flooding was a result of massive rains, falling more than 10 inches in a 24 hour period. Federal funds to rebuild were disbursed to assist the victims of this disaster; including the Herbert Hoover High School…

Highland Park Daycare

By nc | June 22, 2022 | Comments Off on Highland Park Daycare

Highland Park Community Nursery School and Day Care Center (HP Community) was in need of a building solution that was time sensitive and budget friendly. They chose modular construction due to time, budget, and finish requirements. Our team provided a modular building with four classrooms (approximately 720 sq. ft each) with Jack & Jill bathrooms…

Temperature Check Station

By nc | June 22, 2022 | Comments Off on Temperature Check Station

HealthNet of Indianapolis, Indiana needed a Single Point Temperature Check Station for COVID-19 testing. They wanted to purchase a building that was climate controlled so that they could do testing year-round. After reviewing several size options, HealthNet decided on an 8’ x 8’ with a built in workspace counter-top. Our team was given an exact…

Modular Preschool

By nc | June 22, 2022 | Comments Off on Modular Preschool

International Montessori Academy (IMA) in Atlanta, GA needed additional classroom space for their expanding enrollment. IMA already had students signed up to enter the new school in May of 2018. With only 90 days to add additional space by the start of school, a modular solution was the clear choice. VESTA Modular saw this project…

Temporary Healthcare Facility

By nc | June 22, 2022 | Comments Off on Temporary Healthcare Facility

Karmanos Cancer Institute in Farmington Hills was in need of a temporary solution while undergoing major construction to their existing facility. VESTA Modular was selected as the modular builder to provide over 5,600 square feet of exam rooms with physical and general offices to not disrupt the patient flow and care. VESTA utilized an in…

JBSA Fort Sam Houston

By nc | June 22, 2022 | Comments Off on JBSA Fort Sam Houston

USACE requested a bid for the Repair of building 2263 at Fort Sam Houston. As part of the bid our team was selected to provide and lease the modular swing space for the project. We provided and installed two new 23,000 sf administrations buildings for a total of 46,000 sf. Our team was responsible for…

Remote Mining Project

By nc | June 22, 2022 | Comments Off on Remote Mining Project

The Holden Mine Cleanup Project located in a remote area on Lake Chelan in the State of Washington was a $200+ million effort to remediate and address issues with a heavy metal mine that ceased operations during the late 1950s. The mine cleanup was led by Rio Tinto and was necessary to prevent future water…

Hilda L. Solis Care First Village

By nc | June 22, 2022 | Comments Off on Hilda L. Solis Care First Village

A HOMELESS HOUSING SOLUTION THAT WORKS The Hilda L. Solis Care First Village, built on Vignes Street in Downtown L.A., took only five months to complete, despite construction taking place in a busy metropolitan area during the COVID-19 pandemic. The end result of that hard work is 232 full-service dwelling units across temporary and permanent…

Church Classroom/ Meeting Room

By nc | June 22, 2022 | Comments Off on Church Classroom/ Meeting Room

This is a classroom/meeting room for the elders of the church. Their recent growth within the church brought on their need for additional space. They reached out to us to fulfill their needs. We are working to provide them space at several of their locations across Texas. VESTA was hired as the Turnkey General Contractor…

Caribbean Refinery Project

By nc | June 22, 2022 | Comments Off on Caribbean Refinery Project

The Limetree Bay Terminals facility consists of approximately 32 million barrels of crude oil and petroleum product storage, idled refinery units with total peak processing capacity of 650,000 barrels per day, a deep-water port with 10 petroleum docks. VESTA Modular purchased, disassembled, relocated, and reassembled a massive 489 module accommodation facility from the frozen ground…

Permanent Preschool

By nc | June 22, 2022 | Comments Off on Permanent Preschool

In 2009, a preschool in Nashville was opened to replace a daycare facility that was closed by the State of Tennessee. In 2016, a Memphis developer approached the owners to build a new school in their home town, and they chose modular construction due to time and price. Our team was able to offer a…

Landmark Christian School

By nc | June 22, 2022 | Comments Off on Landmark Christian School

Landmark Christian School experienced large growth in student enrollment and needed a quick solution to accommodate the influx of students. VESTA provided the school with two facilities, one with 12 classrooms for high school students and one building that would function as a tutoring facility for groups and individual students. The 12-classroom building was logistically…

Holy Trinity Anglican Church

By nc | June 22, 2022 | Comments Off on Holy Trinity Anglican Church

Lindisfarne Hall, a Christian & Classical School serving 3rd-12th grades located on Amelia Island in the quiet neighborhood of Fernandina Beach, Florida, needed a permanent building solution to meet the continued demand of increasing enrollment without impacting the residential surroundings. When time and cost were the biggest drivers, VESTA Modular, was called upon to design…

Magnet School For the Arts

By nc | June 22, 2022 | Comments Off on Magnet School For the Arts

The Anoka Hennepin School District, faced with increasing enrollment, was looking for cost effective ways to consolidate schools while maintaining a high quality-learning environment. Area residents were concerned that a “typical” modular building would decrease property values. The project architect, ATS&R developed a design that included site-installed brick & horizontal lap siding to match the…

Millennium Community School

By nc | June 22, 2022 | Comments Off on Millennium Community School

Established in 1999, Millennium Community School, a charter school located in Columbus, Ohio serves students in grades K-8. Millennium’s basic educational philosophy states that every child can learn, if taught appropriately. To properly execute this philosophy, the school required an adequate facility. Millennium’s previous facilities were located in a complex of leased and aging buildings.…

Mid-Sioux Opportunity Head Start

By nc | June 22, 2022 | Comments Off on Mid-Sioux Opportunity Head Start

The Mid-Sioux Opportunity Head Start Program had purchased property in Cherokee and applied for and received a grant to help toward building the new facility. After looking into traditional construction, they found the architect fees alone were enough to investigate other options. As a not-for-profit Community Action Agency that helps low income families in Northwest…

Temporary Dental Clinic

By nc | June 22, 2022 | Comments Off on Temporary Dental Clinic

The Mashpee Wampanoag Tribe was in need of a dental facility to serve the tribe that could also be easily relocated to a permanent location in the future. The building needed to be close to the health administration and clinic buildings that our team had previously installed. Most importantly, the dental clinic had to accommodate…

Urban Infill Affordable Housing

By nc | June 22, 2022 | Comments Off on Urban Infill Affordable Housing

VESTA Modular, in partnership with the developer Place Properties for the invest Atlanta initiative, was called upon to provide a high quality, efficient, and affordable housing solution. Invest Atlanta is a major initiative tackling the revitalization of the historic Westside Neighborhood in Downtown Atlanta. With our expert capabilities and experience on past Urban Infill projects,…

Abbeville Area Medical Center

By nc | June 22, 2022 | Comments Off on Abbeville Area Medical Center

Abbeville Area Medical Center was in need of adding a new MRI unit to their existing facility. Due to limited space and the need for a permanent location for their new MRI machine, Abbeville Area Medical Center believed that a modular unit would be more cost efficient, opposed to a mobile unit. The design had…

Multiple Permanent Elementary Schools

By nc | June 22, 2022 | Comments Off on Multiple Permanent Elementary Schools
imagejpeg 0

Ann Arbor Public Schools has experienced a large growth spurt over the past several years. This year was no exception, as they expected a growth of about 600 additional students. The increase in students has caused the school some concerns as they are currently maxed out at several of their facilities. Ann Arbor Public Schools…

Hotel Built in Arctic Circle

By nc | June 22, 2022 | Comments Off on Hotel Built in Arctic Circle

The Arctic Oilfield Hotel is the newest and most advanced accommodation facility on Alaska’s North Slope. The 3-story facility contains 452 private rooms and is situated above the Arctic Circle in the remote town of Deadhorse, Alaska. Due to the remote location (which experiences 24-hour darkness for over a month in the winter), the design…

Cosmetology Building

By nc | June 22, 2022 | Comments Off on Cosmetology Building

The Ashland Community and Technical College (ACTC) cosmetology program was operating in an aging facility and desired to relocate the program to an upgraded location. The initial design was prepared using site-built construction and included a complicated low voltage lighting system and complex HVAC control system, pushing the project over budget. ACTC still wanted an…

Austin Waldorf School

By nc | June 22, 2022 | Comments Off on Austin Waldorf School

Austin Waldorf School serves kindergarten thru 12th grade and is located on 27 wooded acres on the edge of the Hill Country. Instead of a traditional school building with several classrooms the campus hold several cottages. Each Cottage only has one or two classrooms and are connected by granite walkways meandering around oak trees throughout…

Hurricane Response Swing Space

By nc | June 22, 2022 | Comments Off on Hurricane Response Swing Space

VESTA has been recognized as the go to Modular building provider at Camp Lejeune in response to the Hurricane Florence recovery and rebuilding efforts throughout the base. Utilizing the VESTA robust modular buildings and understanding the need for a quick and secure solution, VESTA has provided over 60,000 square feet of building solutions to accommodate…

Community College Driver Training Facility

By nc | June 22, 2022 | Comments Off on Community College Driver Training Facility

Catawba Valley Community College was in need of classroom space for their Driver Training Facility. The advertised their requirements through IPS (Interactive Purchasing System) and VESTA Modular was the successful bidder. After coordinating the custom design and details, VESTA delivered and installed the 24’x52′ modular building with skirting and included a 10′ wide and 52′…

Berkley Senior Services

By nc | June 22, 2022 | Comments Off on Berkley Senior Services

Berkley Senior Services in Martinsburg, WV, was using a 100 year old home for staff space, but the home was in disrepair. They decided the home would need to be torn down and a new office could be built in its place. It was important that the building would blend into the traditional features found…

Breckenridge ISD

By nc | June 22, 2022 | Comments Off on Breckenridge ISD

Breckenridge ISD requested quotations for a multi-classroom modular building to replace older buildings at the South Elementary School. Our team was contracted to demo and remove the existing buildings, pour the pad for the new building and subsequent grading as well as designing, manufacturing, delivering and installing the new 6,144sf six classroom modular building. The…

Casata Austin

By nc | June 22, 2022 | Comments Off on Casata Austin

CASATA was looking for a general contractor who could help turn their micro home dreams into reality. Their first community of micro homes in Austin, TX consisted of 60 modular micro homes that VESTA would build and install on site. Micro home living is different than tiny homes – micro homes range from 400-750 sq…

Indian Health Services | Imaging Building

By nc | June 22, 2022 | Comments Off on Indian Health Services | Imaging Building

Following an original plan to site build a MRI addition to the Claremore Indian Hospital in Claremore, Oklahoma falling through, the hospital was looking for a creative solution. For ­five years they worked to ­find a solution and turned to modular to add the MRI as quickly as possible, while also minimizing the disruption to…

Custom Guard Shack

By nc | June 22, 2022 | Comments Off on Custom Guard Shack

VESTA was selected by DCO Energy to provide a custom build new 8×13 guard shack at Marie H. Katzenbach School for the Deaf. The Marie H. Katzenbach School for the Deaf was first opened in 1883 and has over 100 years of experience educating New Jersey’s Deaf and Hard-of-Hearing children. The new 8×13 guard shack…

COVID-19 Response Office

By nc | June 22, 2022 | Comments Off on COVID-19 Response Office

VESTA was called upon to respond to the overload of patients and medical staff responding to the COVID-19 outbreak. Acting quickly, VESTA was able to provide this overflow space within just a few days. VESTA is honored to support those giving so much to our nation at this time of need.

Quick Serve Restaurant

By nc | June 22, 2022 | Comments Off on Quick Serve Restaurant

Domino’s was searching for an accelerated building solution to complement their aggressive US franchise development program which included a new method and partner who had to not only meet the accelerated timeline, but also the strict functional and aesthetic design criteria; modular construction with VESTA, met those needs. Extensive design collaboration took place with Domino’s…

Cesar Chavez Academy

By nc | June 22, 2022 | Comments Off on Cesar Chavez Academy

Cesar Chavez Academy, a public-school academy located in Detroit, Michigan, was founded on the idea that each student should have a safe, nurturing, and respectful learning environment while maintaining high standards and allowing each student to reach their academic and social potential. When board members approached our team in early 2005 they were paying rent…

Temporary Club House

By nc | June 22, 2022 | Comments Off on Temporary Club House

Flying Horse Golf Club recently opened a new golf course location and needed a temporary club house while they planned to construct a permanent facility. The permanent building would take approximately 2-3 years to complete so Flying Horse needed transitional space for their members while the new facility was under construction. VESTA Modular was able…

Modular STEM School Expansion

By nc | June 22, 2022 | Comments Off on Modular STEM School Expansion

The growing Genesee STEM Academy needed a temporary and permanent modular solution to accommodate the influx of student enrollment for the upcoming school year. With only a few months to get this done, VESTA Modular was able to provide a temporary solution from our available in fleet classrooms as well as complete the design, engineering,…

Modular Fire Station

By nc | June 22, 2022 | Comments Off on Modular Fire Station

In order to accommodate the massive population growth occurring on the east side of the City of Gainesville known as Butler Plaza, the Gainesville Fire Department had to build a brand new Fire Station. Gainesville Fire Rescue found Whatley Law through one of his existing customers, Alachua County School Board. GFR was in need of…

DuBois Integrity Academy

By nc | June 22, 2022 | Comments Off on DuBois Integrity Academy

For years work was being done to open a new charter school in Clayton County, Georgia. When the charter was finally approved in September and then zoning needed for the new facilities approved in November, the DuBois Integrity Academy in Riverdale, Georgia was looking to have their doors open by the next school year. To…

Green Dot Public Schools

By nc | June 22, 2022 | Comments Off on Green Dot Public Schools

Green Dot contacted VESTA with a concept for a three phase approach for starting a new high school in Memphis, Tennessee. In 2017 [9] classrooms were installed for Phase I and then an additional [10] classrooms in 2018 for Phase II-at Bluff City High school. With enrollment continuing to grow, an additional [16] classrooms were…