Green Dot Public Schools Phase I, II, & III

Green Dot contacted VESTA with a concept for a three phase approach for starting a new high school in Memphis, Tennessee. In 2017 [9] classrooms were installed for Phase I and then an additional [10] classrooms in 2018 for Phase II-at Bluff City High school. With enrollment continuing to grow, an additional [16] classrooms were installed  during Phase III in 2019.

Phase I and II are connected buildings, while Phase III is connected with aluminum canopies and walkways for easy and efficient pass-through.

Highlights 

•   Admin Room/16 classrooms/teacher resource rooms

•   Ceramic tile in restrooms (floor and walls)

•   Entries have raised coin rubber flooring

•   11’ wide corridors

•   Fully painted drywall/gypsum

•   Rigid corner guards

•   8’6” Ceiling height in the classrooms

•   Restrooms: Touch free Kohler/Delta plumbing fixtures 

•   Occupancy sensors for all rooms for energy efficiency

•   White boards and tack boards in classrooms 

Green-Dot-Feature-Hallway

THREE PHASE MODULAR HIGH SCHOOL EXPANSION