TEMPORARY OFFICE

PCL Construction was renovating and adding an addition to the Ritz Carlton hotel in Naples, FL. PCL was looking for a modular building provider that could build offices for their on-site contactors VESTA Modular was able to provide PCL Construction with an efficient turnaround time with new modulars for the five plex. Our team worked cohesively with our local engineer and setup crew to create a plan to offer a higher dry-stack install, which the county required due to the site being in a flood zone. Each pier also required to be surface bonded to ensure durability and strength in the area that could potentially be flooded.

VESTA Modular provided (1) 60 x 60 and (1) 12x56 for PCL and (1) 12 x 56 for their electrical sub (Tri-City); delivering where and when the customer had wanted and expected and completed this project on time and on budget.

Ritz Carlton exterior

CONSTRUCTION OFFICE FOR HOTEL ADDITION AND REMODEL