PVS Chemical Solutions

PVS Chemical Solutions was in need for a new Men’s Shower/Locker/Break Room facility as part of a plan to upgrade facilities at its Chicago manufacturing operation. A very high level of priority was placed on providing a better working environment for the production team. New showers, restrooms and a locker area were provided to replace…

Read More

Martha’s Vineyard

The Town of Tisbury, on the island of Martha’s Vineyard, had an elementary school that needed renovation to the building, which was plagued with lead, asbestos, and building envelope problems. The convenience of modular and the lack of access to the surrounding buildings led the town to release this project out to bid. The proposed…

Read More

Birdville Independent School District

The board of Birdville ISD identified the need to consolidate existing modular units of one of their elementary campuses into a single building. The elementary school previously had four 24’x64’ double classroom buildings with standard interior and exterior finishes. The school board’s mission was to consolidate the four individual buildings into one permanent 8 classroom…

Read More

MANCHESTER BOE

Manchester BOE needed additional office space since they ran out of offices in their administration office. They required a building that had 6 private offices. VESTA was able to provide a used building that had the space to accommodate what they needed. VESTA installed the office building in short time and great customer service. We…

Read More

FREEDOM CHURCH

FREEDOM CHURCH Group photo

Freedom Church does a yearly, special televised local event and was looking for a temporary solution to utilize for the month of October. They needed a temporary staging area for their performers, including costume storage, changing room and makeup area. They required space close to their existing building with easy access to the sanctuary’s side…

Read More

Cirque Du Soleil

Cirque Du Soleil America Newco Inc needed temporary offices for their upcoming show in Atlanta. The offices would accommodate accounting, security, technical personnel, and their staff during the 3 month show. They had limited space available for offices and storage, in an open parking lot where they were setting up “The Big Top”, and would…

Read More

Detroit Leadership Academy

Detroit Leadership Academy is a pre-k through 12 program that has grown tremendously over the years, resulting in the need for additional classroom space, which VESTA provided in three phases. In the first and second phases, our team added a 4 and 6 classroom building with restrooms, respectively, to serve the elementary and preschool students.…

Read More

E-CENTER HEAD START

Due to over-crowding and an increase in enrollment, E-Center, a Head Start backed daycare in Northern California, needed a solution to accommodate their growth. With time constraints and a need for minimal site disruption, they turned to modular construction for a cost and time effective, streamlined solution. VESTA provided a 36×48 modular daycare building including…

Read More

CALCASIEU PARISH SCHOOLS

Hurricane IDA caused significant damage to the Calcasieu Parish Schools creating a challenge for students to return to class. VESTA was able to step up in helping provide over 100,000 square feet of temporary modular classroom and office space throughout the district. With a critical need, VESTA was able to quickly secure manufacturing line time…

Read More

TERREBONNE SCHOOL DISTRICT

Terrebonne Parish School District had two school campuses completely destroyed during Hurricane Ida. They needed temporary space quickly to get the students back in class and relieve overcrowding at other buildings within the district. VESTA was awarded the job of designing and building two entire high school campuses for South Terrebonne High School and Ellender…

Read More