Beyond the Box | Inserv Solutions

Inserv Solutions was subcontracted by Eli Lilly Pharmaceuticals at the site of their new pharmaceutical manufacturing plant in Concord, NC. Inserv needed enough office space to accommodate their engineers, project managers, site superintendents, and workforce. They also needed a one stop shop for all ancillary products. VESTA provided the solution of a 48×60 V-plex office…

Read More

Beyond the Box | Detroit Leadership Academy

VESTA’s Beyond the Box program offers add on services that can be customized to fit your needs. Due to enrollment growth, The Detroit Leadership Academy needed an additional modular classroom building and with it they had VESTA provide a turnkey solution that included furniture as well as ADA compliant aluminum deck, steps, and ramps. The…

Read More

FABCON PRECAST

Fabcon bought an old pre-cast concrete plant that was in need of immediate repairs. In order to expedite the opening of the factory floor to take orders, they needed a locker room building. We provided them with a 24’x 60’ locker and rest-room that had 75 double tier lockers for their employees. Because of the…

Read More

Kreate Events Storage

VESTA provided Kreate Events with (4)8’x40’ and (2) 8’x20’ for equipment storage while preparing for the big game. Kreate Events needed storage space to hold all equipment for the venues surrounding Hard Rock Stadium while they set up all the spaces. VESTA leased the containers for 1 month for set-up and teardown of the game.

Read More

Decco Restrooms

VESTA was hired to design, manufacture and deliver (2) 12’x32’ restroom trailers to Port Everglades to be shipped to a beach club in the Cayman Islands. The customer handled shipping freight and install at the beach club. The men’s restroom building comes with 6 toilets, 6 urinals and 5 sinks. The women’s restrooms has 8…

Read More

Traphagen Elementary School

Traphagen

Mount Vernon City School District was renovating Traphagen Elementary School and was not going to be completed in time for the start of the school year. We worked with the client to utilize an existing 2-classroom building to meet their needs. They did not need restrooms so we converted the existing restrooms into storage closets.…

Read More

South Windsor Public Schools

South Windsor Public Schools needed a modular supplier to provide classroom space due to increased enrollment. VESTA was able to utilize a cooperative purchasing agreement to supply South Windsor with the classroom space they needed and within a quick time frame. We provided them with an existing 4 classroom building that would fit their requirements…

Read More

LaGrange Lock and Dam

LaGrange Lock and Dam is a complex on the Illinois River at Versailles, Illinois. The U.S. Army Corps of Engineers built the complex from 1936 to 1939. LaGrange Lock and Dam needed a Control Shed that would be placed inside the dam area to control the dam and locks. When river waters rise, the control…

Read More

Central Bucks School District

Central Bucks School District needed additional 4 classrooms for at least 6 years due to increased enrollment. VESTA was able to step in and provide a turn-key classroom solution with carpet tiles, fire suppression and a connecting ADA corridor to the existing school. We were able to utilize a cooperative purchasing agreement which avoided a…

Read More

Cleveland County Emergency Medical Services

Cleveland County Emergency Medical Services (EMS) provides life-saving services to citizens during medical emergencies. They needed a quick housing solution for the responders while on the job. VESTA provided them with a living space that has 2 bedrooms, 3 full bathrooms, kitchen and living room as well as laundry space. We finished the exterior with…

Read More